Floor Paints and Line Markers

Browse our range of floor paint and line marker spray paints, available in both permanent and semi-permanent formulas and a wide range of colours to keep your worksite organised and safe.

Available in two colours, matt grey and matt red, floor paint is designed for concrete, stone and wooden flooring. Ideal as a garage floor paint, it provides a clean, hard-wearing finish. 

For line marker paint with permanent application, opt for Trafficline, in a choice of three colours, while the semi-permanent Surveyline range is available in the seven different colours for spot marking features and hazards of a worksite, lasting a minimum of three months.

Create an account or log in today to add concrete floor paint or line marker paint to your order.

Get the perfect finish for your floor 

Floor paint is easily applicable over large areas and will be touch dry 2-4 hours after use – allow 16-24 hours before applying additional coats. Floor paint gives enhanced durability and abrasion resistance, thanks to its solvent-based polyurethane formula.

Concrete floor paint can be applied on concrete at least six months old and is suited to light to medium traffic only. 

Get your markers in line 

Surveyline

  • Semi-permanent formula for contractors when spot marking that lasts at least three months 
  • Available in seven colours: white (general), red (electricity), yellow (general, gas), blue (water), orange (general), green (cable work) and black (old lines)

Trafficline

  • Heavy-duty latex formula ideal for car parks, warehouses, playgrounds etc.
  • Available in three colours: white (general), yellow (caution/hazard), red (danger/prohibited)

Get floor paint and line marker paint with The Builders’ Brand

Our line marker paints are developed with the same expertise as the rest of our building supplies, so contact us or check out our FAQs if you want any more information. Plus, take a look at our blog for further insights.

Ready to order? Create an account or log in to get started. Orders placed before 12 noon will be delivered in three working days to keep your project moving.

Displaying 3 of 3 results.